Press lounge
Press lounge
  Back

BREITLING TEMPORARILY CLOSES ITS PRODUCTION SITES IN LA CHAUX-DE-FONDS AND GRENCHEN

0 cart
 BREITLING TEMPORARILY CLOSES ITS PRODUCTION SITES IN LA CHAUX-DE-FONDS AND GRENCHEN

As a consequence of the current COVID-19 situation, Breitling has decided to close the production sites in La Chaux-de-Fonds and Grenchen from March 19 until April 1, 2020. At the moment, we anticipate resuming production after that date.

We are fully committed to doing everything we can to slow down the spread of the coronavirus and protect our employees. We are hopeful that the decisive steps we are taking will help slow down the spread of the virus and therefore enable hospitals and the health care system to provide full treatment, especially for the risk groups affected.

By making health and safety our main priority, we will be able to get through this challenging time and resume our normal activities as soon as possible. All of us are now part of the same squad and, together, we will succeed in this mission. 

The entire Breitling management team wishes you the best of health in the days ahead and looks forward to seeing you soon! #flattenthecurve #stayathome #squadathome

Release date 18.03.2020
Title Breitling Temporarily Closes Its Production Sites in La Chaux-de-Fonds and Grenchen
Tags
Reference 32552
Download
pdf version
download
zip version All languages pdf and images Download

Press contact

Romy Hebden
Phone: +41 32 654 54 54
E-mail: media@breitling.com

Breitling SA
Léon Breitling-Strasse 2
2540 Grenchen - Switzerland

Newsletter

New versions, new models, special events… Keep up to date with the latest Breitling news.

BREITLING / BREITLING SUMMIT 2018 / PREMIER COLLECTION
Date Dimensions Size Copyright Reference
insight adsrvr